Construction Cost: $81 million
General Contractor: H & K Group, Skippack, PA
Construction Start: 2020
Construction Completion: 2023
Section BS1 of the rebuilding of I-95 at the Bridge Street Interchange will reconstruct the northbound and southbound lanes of I-95 from relocated Carver Street to Levick Street. BS1 construction was substantially completed in summer 2023.
I-95/BS1 Details:
Construction Cost: $267.9 million
General Contractor: James J Anderson Construction, Philadelphia, PA
Construction Start: 2022
Construction Completion: 2028
Section BS2 will rebuild I-95 northbound and southbound from just north of Margaret Street to just south of Van Kirk Street. This section includes the removal of the southbound Bridge Street off-ramp at James Street. A new southbound off-ramp will connect directly to Tacony Street near Van Kirk Street. Also planned is a new on-ramp from Tacony Street and the Delaware Avenue extension to northbound I-95 in the vicinity of Arsenal Business Center and the Dietz & Watson facility. When this new ramp is completed, the existing northbound I-95 on-ramp from Bridge Street will close. A significant aspect of this project is the replacement of the viaduct that carries I-95 over Tacony Street and Bridge Street. Preliminary Engineering for this section finished in November 2011, and Final Design began in fall 2013. BS2 construction began in 2022.
I-95/BS2 Details:
Typical Completed Roadway Section
Construction Cost: TBD
General Contractor: TBD
Construction Start: 2029
Construction Completion: 2034
Section BS3 includes reconstruction of Aramingo Avenue from Church Street to James Street. Preliminary Engineering for this section finished in November 2011 and Final Design began in 2016. Construction is anticipated to start in 2029.
I-95/BS3 Details:
Construction Cost: $81 million
General Contractor: AP Construction Co., Blackwood, NJ
Construction Start: January 2017
Construction Completion: Late 2020
Section BS4 included the remaining work to complete the reconstruction of the interchange ramps west of Aramingo Avenue. Section BS4 completed the ramps connecting Aramingo Avenue to and from the Betsy Ross Bridge. It also included the reconstruction of Aramingo Avenue from Wheatsheaf Lane to Church Street, the construction of the Adams Avenue Connector, and the construction of the first section of the Frankford Creek Greenway. Construction began in January 2017 and was completed in late 2020.
I-95/BS4 Details:
Reconstruct and widen Aramingo Avenue from Wheatsheaf Lane to Church StreetConstruction Cost: TBD
General Contractor: TBD
Construction Start: 2029
Construction Completion: 2031
Section BS5 will extend Delaware Avenue from Orthodox Street to the terminus of the new Bridge Street ramps being constructed as part of the I-95 Section BS2 project near the Honor Foods distribution center and Dietz & Watson facility. Preliminary engineering for BS5 began in 2016, with construction expected to start in 2029 and conclude in 2031.
The Delaware Avenue extension will also include connections to Buckius Street and Richmond Street via extensions of each street. Bicycle and pedestrian infrastructure will be incorporated along Bridge and Buckius streets to link the neighborhood with riverfront parks and trail features. A shared-use path along the Delaware River will provide access to Borski Park (opened July 2025), the Frankford Boat Launch, and the Kensington and Tacony (K&T) Trail to the north.
I-95/BS5 Details:
BS5 Delaware Avenue Extension – Project Area Map
BS5 Delaware Avenue Extension – Typical Completed Roadway Section
Construction Cost: $160.3 million
General Contractor: Joint Venture of Driscoll Construction Co., Blue Bell, PA, and R.E. Pierson, Pilesgrove, NJ
Construction Start: March 2015
Construction Completion: Fall 2017
Section BR0 of the rebuilding of I-95 at the Betsy Ross Bridge Interchange is complete. Work began in March 2015 and finished at the end of 2017. Section BR0 rebuilt most of the existing ramps at the interchange and partially constructed the missing ramps between the Betsy Ross Bridge and Aramingo Avenue. The ramps will be completed and opened to traffic under the Section BS4 project (see BS4: 2017-2020). The new ramps connecting the Betsy Ross Bridge to and from Aramingo Avenue will be completed and opened at the completion of the Section BR2 project.
I-95/BR0 Details:
Widen the ramp bridge (Ramp C) and carrying northbound I-95 traffic to Aramingo AvenueConstruction Cost: $93.6 million
General Contractor: Buckley & Company, Philadelphia, PA
Construction Start: 2020
Construction Completion: 2023
Section BR2 includes additional ramp improvements at the I-95/Betsy Ross Bridge Interchange. Section BR2 began in 2020 and will replace portions of four ramps.
I-95/BR2 Details:
Construction Cost: $355.3 million
General Contractor: Haines & Kibblehouse Construction, Skippack, PA
Construction Start: 2025
Construction Completion: 2031
Section BR3 includes reconstruction and widening of the northbound lanes of I-95 from Wheatsheaf Lane to just north of Margaret Street. BR3 construction began in May 2025.
I-95/BR3 Details:
Construction Cost: TBD
General Contractor: TBD
Construction Start: 2029
Construction Completion: 2034
Section BR4 includes reconstruction of the southbound lanes of I-95 from Wheatsheaf Lane to just north of Margaret Street. Preliminary Engineering for this section was finished in December 2011. Final Design began in 2022, with construction anticipated to start in 2029.
I-95/BR4 Details:
Completed I-95 Lane Configuration
Construction Cost: TBD
General Contractor: TBD
Construction Start: 2028
Construction Completion: 2030
Section BR5 includes work on three bridges carrying the Conrail/NJ Transit (DelAir Branch) railroad line. The bridges carry the railroad over I-95, abandoned Thompson Street, and the I-95 ramps to the Betsy Ross Bridge (Ramp A) and Aramingo Avenue (Ramp C). Preliminary Engineering for this section finished in December 2011 and Final Design began in 2020, with construction anticipated to start in 2028.
I-95/BR5 Details: